Healthcare Project 2
Scope of Work: Act as Lead BIM coordinator while also laying out the MEP systems for the individual subcontractors. We detailed the project to a LOD 400 for the systems to be prefabricated. Subcontractor Fireproofing, Steel, and Fire Protection models were all utilized in the coordination efforts. We ran clash detection for the weekly meeting with our client. Navisworks was used to create the clash groups and manage Viewpoints.
Project Facts
-
This project is comprised of a 1 story hospital with two patient wings. The project includes a kitchen and special treatment rooms.
-
Included Systems:
- HHW S/R Piping
- CHW S/R Piping
- Condensate Piping
- Medium and Low Pressure Supply, Return, Exhaust Ductwork
- Kitchen Exhaust Ductwork
- Greasy Waste
- Sanitary Waste
- Domestic Cold, Hot and Return Water
- EMT Conduit Racks
- Medical Gas Piping
- Fire Protection Piping
- Structural Steel with Fireproofing