Healthcare Project 1
Scope of Work: A design assist approach to layout of the plumbing gravity system. BIM Solutions was subcontracted to assist with the layout. The coordination effort included multi trade racks.
Project Facts
- This project is comprised of a new 6 story patient tower.
- Included Systems:
- Storm Drain and Storm Overflow Piping
- Sanitary Waste and Vent Piping