High Rise Project

Scope of Work: A design assist approach to layout of the plumbing systems for the project. 

Plumbing System Description: The project consists of 200 apartments, meeting spaces, lounges, saunas and multiple pools. The high-rise apartments are laid out using pro-vent waste systems.

 Included Systems:

  • Storm and Overflow Piping
  • Domestic Hot and Cold Water Piping
  • Greasy Waste Piping
  • Sanitary Waste Piping
  • Civil Drainage
  • Pool Equipment

Project Facts

  • This project consists of a new 31-story high-end apartment building with a parking garage and among other amenities a rooftop pool.

  • Project Metrics:

    • 4 Modelers
    • 12 Month Duration
    • 53 Shop Drawings
    • 25 Sleeve Drawings